Novara Hub

Welcome to our largest Road Hub in Europe: Novara

A new key asset has been added to the FedEx European Road Network: our Novara Road Hub.

Located in a strategic geographic area for the European and Italian markets, and equipped with state-of-the-art technologies, the site offers better reliability, continuous improvement in on-time performance and an increased network capacity.

Our hub – key figures:

Profile icon
Profile icon
Profile icon

450

employees



Ideas icon
Ideas icon
Ideas icon

Driven by sustainability principles, the new hub is certified as a LEED Gold building and has been assessed through a Carbon Footprint analysis.



Tools icon
Tools icon
Tools icon

6,683 m2

of flooring by galvanized steel gratings



Supplies icon
Supplies icon
Supplies icon

21,600

packages

8,000

documents

4,000

freight shipments sorted per hour



Measurement icon
Measurement icon
Measurement icon

210,000 m2

of site area

18,000 m2

of warehouse

9,400 m2

of warehouse for the freight area



Big rig icon
Big rig icon
Big rig icon

245

Trucks IN

265

Trucks OUT

every day to connect the European Road network and the Domestic network

240 truck docs
170 truck parks and
372 trailer parks



Belt icon
Belt icon
Belt icon

3.73km

the total length of converyor
(equivalent to 11 laps of a football field)



Integration icon
Integration icon
Integration icon

2.7 m/s

cross belts sorter speed
(almost 10 km/h)



Tools icon
Tools icon
Tools icon

522

conveyor belts power units



Novara hub 1
Novara hub 1
Novara hub 1

Operational innovation at the service of your business

The handling of parcels and freight independently is the foundation of the Novara Road Hub operating model.

This design is an innovation in the industry that looks at responding to the increasing demand for goods due to the e-commerce growth.


Novara hub 2
Novara hub 2
Novara hub 2

Advanced technology for an increased reliability

Our newest best-in-class sorter is the most advanced of its kind.

The facility, equipped with 522 conveyor belts, can process 21,600 packages, 8,000 small parcels and documents and 4,000 freight shipments per hour.


Novara hub 3
Novara hub 3
Novara hub 3

Delivering a sustainable future through a sustainable hub

As we continue our journey to carbon neutral operations by 2040, seeking ways to protect our planet, this new facility prioritizes sustainability in every aspect of its construction.